Skip to main content

Initial Excavation and Material Removal

1:42
26:03
1.6M views

At 1:42 in

I think we pissed off the neighbor...

What happens here

A compact mini loader and a Bobcat 325 mini excavator are used to fill an unexplained hole in the ground and skim down the existing grade. This process ensures enough material is removed to allow for the future addition of mulch and other drainage materials while maintaining clearance below the foundation's weep holes.

Goal: Heavy machinery is brought in to fill existing holes and remove excess material from the area along the building's foundation. This prepares the site for the installation of the new drainage system.

Tools and materials

  • Bobcat 325 Mini Excavator
  • Bobcat Mini Loader

What they say

Hide

elevation away that's what we're doing first thing we got to do is fill the hole in and that hole i don't know what caused it but we've got to fix it we've also gotta skim the entire grade down so that we have clearance below those wicks because then we're gonna add mulch and we're gonna add materials back in and so we've gotta take enough material out to be able to add material back in that we want in

Auto-generated from the video audio.