Skip to main content

Bedding Layer Installation (Sand Screeding)

0:33
1:51
12.5K views

At 0:33 in

I Built This In 4 Days and Saved $7,150

What happens here

The worker transports sand using the Ryobi electric power wheelbarrow and dumps it onto the compacted gravel base. Screed pipes (long PVC pipes) are then laid parallel on the base at the desired finished height of the sand layer. A long, straight level or screed board is pulled across the top of these pipes, effectively shaving off excess sand and creating a perfectly flat and uniform bedding layer. The screed pipes are then carefully removed, and the small channels left behind are filled with sand and smoothed.

Goal: A precise layer of bedding sand is installed and leveled using screed pipes and a straight edge to create a uniform surface for the pavers.

Tools and materials

  • Long Level / Screed Board
  • PVC Pipes (Screed Pipes)
  • Ryobi Electric Power Wheelbarrow
  • Shovel
  • Bedding Sand

What they say

Hide

shorty trying to get it rolling. Young and grinding, he going to get it. Put them peas up in the slowly. He going to drive 1,000 miles till the pockets keep on growing. I be skating all the ice on my neck like a goalie. When she was you, your shorty, she pursuing me would hate if I was you. Yeah, we the best at doing it, baby. >> We the best at doing it. >> We the best at doing it, baby. That three.

Auto-generated from the video audio.