Establish Final Slope and Erosion Control
At 3:22 in
How we rebuild a Failed Retaining wall WITHOUT adding new retaining walls 4 k video
What happens here
Once the structural fill is compacted, the final step is to grade the slope to the specified ratio, in this case, 2.5:1, to ensure long-term stability and ease of vegetation establishment. The use of a tape measure is shown to verify the accuracy of the slope. A silt fence is maintained at the base of the slope to control erosion and sediment runoff, particularly important until vegetation can take root and stabilize the soil naturally. This comprehensive approach, approved by both the city and a civil engineer, ensures that the buried retaining wall and the new slope effectively manage water, preventing hydrostatic pressure and soil movement over time. The careful attention to grading and erosion control helps to create a robust, naturally draining outdoor structure.
Goal: Fine-tune the grade of the new slope to meet engineering specifications (2.5:1 ratio) and install erosion control measures like a silt fence to protect the area until vegetation can be established.
Tools and materials
- ASV RT-75 Posi-Track Skid Steer
- Shovels/Rakes
- Tape Measure
- Silt Fence Unspecified
What they say
(483 characters)Hide
What they say
(483 characters)Auto-generated from the video audio.