Compacting Structural Fill in Lifts
At 1:38 in
How we rebuild a Failed Retaining wall WITHOUT adding new retaining walls 4 k video
What happens here
The most crucial step for the long-term stability and drainage of the new slope is the proper compaction of the structural fill soil. The video highlights that compaction must be done incrementally, in 'small lifts', rather than dumping all the material at once. The weight of the ASV RT-75 Posi-Track skid steer itself is utilized as the primary compaction tool, driving over each layer of fill multiple times. This process, although time-consuming (taking two days just to reach the bottom), is essential. It marries the new soil into the existing bank, preventing future settling, erosion, and ensuring effective water percolation through the backfill material. This method addresses the drainage system requirement by creating a permeable, stable slope that naturally reduces hydrostatic pressure.
Goal: Continuously add and compact the structural fill soil in small lifts using the heavy machinery to ensure maximum density and long-term stability of the new slope, thereby preventing future settlement and drainage issues.
Tools and materials
- ASV RT-75 Posi-Track Skid Steer
- Dump Truck
- Structural Fill Soil Unspecified
What they say
(1,537 characters)Hide
What they say
(1,537 characters)Auto-generated from the video audio.