Setting Up for Vertical Alignment
0:24
1:16
187.6K views
At 0:24 in
How to use a plumb bob
What happens here
To prepare the plumb bob for checking vertical alignment, first ensure the length of the string is set so that the bob hangs freely without touching the ground or any obstructions. Then, securely tie the string to a stable reference point, such as the top of the object you want to check for verticality (e.g., a wooden post). Once tied, allow gravity to stabilize the plumb bob until it stops swinging and comes to a complete rest, indicating a true vertical line.
Goal: Prepare the plumb bob for accurate vertical measurement.
Tools and materials
- Plumb Bob — To create a vertical reference line
- String — To suspend the plumb bob
- Wooden Post — The object being checked for plumbness
What they say
(600 characters)Hide
What they say
(600 characters)Auto-generated from the video audio.