With both coats of stain applied, the crucial final step is to allow for adequate drying and curing time. Let the stained driveway and walkway dry for a minimum of two full days (48 hours) before allowing any foot traffic or driving vehicles over the surface. The presenter emphasizes that proper surface preparation, specifically ensuring the concrete surface is sufficiently 'rough' or porous, is vital to prevent future problems like peeling. If the surface isn't rough enough, an acid etching process may be necessary (though not required for this project).
Goal: Ensure the stained concrete is fully dry and cured before resuming normal use.