What happens here

After the main siding is painted, attention turns to the details. This involves masking doors and windows, and spray painting them. New shutters are painted and then re-installed by drilling holes for the shutter buttons. Fascia and trim are also painted, often by hand or with a smaller roller, to provide contrast and a finished look. An Adirondack chair is also spray painted white to match the front trim, completing the coordinated exterior aesthetic.

Goal: Apply paint to all detailed areas, including doors, shutters, trim, and outdoor accessories.

Tools and materials

  • Drill — Drilling holes for shutter installation
  • Masking Paper/Plastic — Protecting larger areas like window glass from overspray
  • Masking Tape — Protecting areas not to be painted around doors and windows
  • Paint Brush — Painting fascia and trim
  • Paint Sprayer — Spraying doors and shutters
  • Shutter Buttons — Installing new shutters

What they say

Hide

All the masking is complete. I've sprayed the front of it now. Now finished spraying the front two sides. We got one guy working on fascia. We're getting ready to mass spray the door. We've already started spraying the shutters and these were brand new shutters. So, we had to drill holes to install the shutters with shutter buttons. And we're working our way around doing the fascia and trim. Fascia's being done. The other side goals on the roof. That side's been sprayed. He's up there doing fascia. We've now completed the shutters doors. We've reinstalled the shutter front door, gone around with a second coat on the fascia trim. We're working around the trim on the backyard. And we just sprayed their aderond deck chair to match the front trim. Also, we're working our way on the backside doing first coat and second coat on the back. It's now almost 4:00 and we're 5 and 1/2 hours into this job with four colors and we've sprayed their chair. Got installed the shutters now. Front door is back up painted. We've been begun installing down spouts and second coating the fascia trim in the back. I got up here doing down spouts or doing fascia. And we're actually working our way around the back. Everything's sprayed. Everything's done up front. We're also