Fill Basin
4:40
14:14
22.9K views
At 4:40 in
How to install a waterfall in 2 hours & 20 minutes steps 7-14
What happens here
Proceed to fill the basin area surrounding the pump and liner with a compactable material, such as sand or soil. This action serves to securely hold the pump in place and to begin sculpting the initial landscape around the waterfall's reservoir. This particular step is often integrated with the placement of boulders, allowing for a more cohesive development of the hardscape and surrounding terrain.
Goal: Create a stable base around the pump and define the initial landscape
Tools and materials
- Shovel — Moving and shaping sand/soil
- Sand/Soil — Filling and shaping the basin area
What they say
(329 characters)Hide
What they say
(329 characters)Auto-generated from the video audio.