Execute Controlled Demolition and Cleanup
2:48
4:56
6K views
At 2:48 in
How to do a $4,000 job in One day -Silo Demo
What happens here
With the cable securely attached, a 'tug' from the tractor initiates the controlled fall of the silo. The strategic weakening and cable placement ensure that the silo topples away from the barn and power lines, landing on open ground. After the first silo is down, the process is repeated for the second silo. The impact creates a significant dust cloud and rubble pile. The commentator later reveals the financial breakdown of the job: a $4,000 contract with $250 for mobilization, $1,200 for labor, and $80 for dump fees, resulting in a profit of $2,470.
Goal: Topple the silos safely and remove debris.
Tools and materials
- Large Cable — The means of connecting the tractor to the silo
- Tractor — Providing the pulling power to bring down the silos
What they say
(742 characters)Hide