Assess and Plan for Silo Removal
2:15
4:56
6K views
At 2:15 in
How to do a $4,000 job in One day -Silo Demo
What happens here
The project begins with an assessment of two old, crumbling silos that have been standing for over 60 years and are now empty and deteriorating, posing a safety risk. It is noted that the nearby barn is only 12 inches away, and power and phone lines are in the vicinity, necessitating careful planning. The overall job was a $4,000 contract to remove both silos.
Goal: Understand the scope, risks, and objectives of the silo demolition.
Tools and materials
- Nearby Barn N/A — A structure that must be protected from demolition impact
- Power and Phone Lines N/A — Utilities that must be disconnected or protected during demolition
- Silos N/A — The primary structures to be demolished
What they say
(396 characters)Hide
What they say
(396 characters)Auto-generated from the video audio.