Prepare Base with Proper Drainage Aggregate
1:23
19:47
462.8K views
At 1:23 in
How To Build an Engineered Retaining wall & Avoid Contractors that cut corners
What happens here
After initial excavation, prepare the base for the retaining wall. This involves leveling the ground and laying a foundation of drainage aggregate. The video highlights that angular stone should be used for backfill and drainage layers, as it locks together and provides proper drainage. River rock, being rounded, does not interlock and can lead to instability and wall failure. Ensure the aggregate layer is properly compacted.
Goal: Establish a stable, well-draining base for the retaining wall.
Tools and materials
- Plate Compactor Wacker Neuson — Compacting the drainage aggregate and soil in layers
- Shovel — Spreading and leveling aggregate by hand
- Skid Steer Bobcat T180 — Transporting and spreading drainage aggregate
- Angular Drainage Aggregate — Creating a stable, well-draining base and backfill layer
What they say
(379 characters)Hide
What they say
(379 characters)Auto-generated from the video audio.