Implement Rain-Ready Measures

12:47
19:47
462.8K views

At 12:47 in

How To Build an Engineered Retaining wall & Avoid Contractors that cut corners

What happens here

During construction, especially if rain is expected and work is paused, implement 'rain-ready' practices. This involves compacting any open excavation areas, backfilling lifts, and covering exposed soil and newly laid material with heavy-duty tarps (like blue tarps), secured with blocks. This protects the work from erosion and prevents saturation, ensuring that the site is ready to resume construction promptly when the weather improves.

Goal: Protect the construction site from weather elements and maintain soil integrity during breaks.

Tools and materials

  • Heavy-Duty Tarps — Covering exposed soil and materials to protect from rain
  • Plate Compactor Wacker Neuson — Compacting any open soil areas before covering
  • Retaining Wall Blocks — Securing tarps in place