Install Deck Frame (Ledger Board and Rim Joists)
At 15:28 in
How to Build a Simple Deck
What happens here
Once the concrete footings have cured, the next step is to install the ledger board and outer rim joists. A pressure-treated 2x8 lumber board is measured, cut, and positioned against the house foundation. Lag bolts are used to securely anchor the ledger board to the house's footings, ensuring it is level and properly aligned. Additional pieces of 2x8 pressure-treated lumber are then attached to the ledger board and supported by the post base anchors to form the outer perimeter (rim joists) of the deck frame. These connections are secured using appropriate fasteners and techniques to create a stable rectangular frame for the deck.
Goal: Construct the main structural frame of the deck, securely attaching it to the house and footings.
Tools and materials
- Circular Saw Ryobi — Cutting lumber to size
- Impact Driver Ryobi — Driving lag bolts and other fasteners
- Joist Hangers Simpson Strong-Tie — Connecting joists to the ledger board and rim joists
- Lag Bolts — Securely attaching the ledger board to the house foundation
- Measuring Tape — Accurate measurement of lumber
- Pressure-Treated 2x8 Lumber — Constructing the ledger board and rim joists of the deck frame
- Screws/Nails for Joist Hangers — Securing joist hangers
What they say
(2,497 characters)Hide
What they say
(2,497 characters)Auto-generated from the video audio.