Install Cedar Paneling on Walls and Ceiling
7:15
18:27
2.4M views
At 7:15 in
How to Build a Sauna inside a Shed
What happens here
Begin installing the cedar tongue-and-groove paneling on the ceiling first, then move to the walls. Use a brad nailer to secure the planks, driving nails into the tongue part of the board so they are hidden by the next plank. Ensure proper spacing for expansion and contraction of the wood due to heat and moisture. When installing the ceiling, leave small gaps where the ceiling meets the walls to allow for natural movement. Repeat the process for the walls, ensuring the first board at the bottom sits flush with the floor. It's crucial to leave small gaps at corners and edges, as the wood will expand and contract.
Tools and materials
- Brad Nailer
- Cedar Tongue-and-Groove Planks
- Circular Saw / Miter Saw
- Utility Knife
- Brad Nails
What they say
(1,034 characters)Hide
What they say
(1,034 characters)Auto-generated from the video audio.