Subbase Preparation and Compaction
At 0:56 in
How to Build a Patio - An easy Do it Yourself Project
What happens here
Prepare the subbase, which is the raw soil beneath the patio area. It is crucial to remove all organic material, such as grass, black dirt, turf, and roots, as these will decompose and compromise the patio's stability. Once cleared, compact the subbase thoroughly. A 'spike test' is demonstrated: if a 10-12 inch spike can be driven into the subbase with only two or three hits of a hammer, the subbase is too soft and requires soil correction (more compaction or addition of stable material). For effective compaction, use heavy equipment. A 150-pound plate compactor is typically insufficient; a 1000-pound plate compactor or a 3-inch trench compactor is preferred for deeper and more reliable compaction. If the subbase has high moisture content, consider laying down a filter fabric before adding the base material to prevent mixing and aid drainage.
Goal: Create a firm and stable subbase free of organic material.
Tools and materials
- Bobcat S250 — Moving and spreading soil, potentially equipped with a compactor attachment
- Hammer — Driving the spike for testing
- Heavy-Duty Plate Compactor — Compacting the subbase. A 150lb compactor is often insufficient
- Spike — Testing subbase compaction
- Filter Fabric / Geotextile — Separating subbase from aggregate base, especially in high-moisture areas
What they say
(1,309 characters)Hide
What they say
(1,309 characters)Auto-generated from the video audio.