Skip to main content

Subbase Preparation and Compaction

0:56
9:40
2.2M views

At 0:56 in

How to Build a Patio - An easy Do it Yourself Project

What happens here

Prepare the subbase, which is the raw soil beneath the patio area. It is crucial to remove all organic material, such as grass, black dirt, turf, and roots, as these will decompose and compromise the patio's stability. Once cleared, compact the subbase thoroughly. A 'spike test' is demonstrated: if a 10-12 inch spike can be driven into the subbase with only two or three hits of a hammer, the subbase is too soft and requires soil correction (more compaction or addition of stable material). For effective compaction, use heavy equipment. A 150-pound plate compactor is typically insufficient; a 1000-pound plate compactor or a 3-inch trench compactor is preferred for deeper and more reliable compaction. If the subbase has high moisture content, consider laying down a filter fabric before adding the base material to prevent mixing and aid drainage.

Goal: Create a firm and stable subbase free of organic material.

Tools and materials

  • Bobcat S250 — Moving and spreading soil, potentially equipped with a compactor attachment
  • Hammer — Driving the spike for testing
  • Heavy-Duty Plate Compactor — Compacting the subbase. A 150lb compactor is often insufficient
  • Spike — Testing subbase compaction
  • Filter Fabric / Geotextile — Separating subbase from aggregate base, especially in high-moisture areas

What they say

Hide

Point let's look at the subbase material or the raw soil this is the most critical element to get right when you're installing your base because if your subbase material goes wrong your patio can't help but fail so how do you know if you're working on good sub based material here's a little tip to let you know if you've got good subbed material take a spike and start pounding it in if you can hit that Spike two or three times and drive a 10 or a 12in spike all the way down to the top of the nail head your subbase is too soft which means you've got got to do a soil correction but if you pal that steak in and you hammer on it and you hammer on it and you hammer on it and you can't get that steak to move you're in good shape it is absolutely critical that you compact the subbase you use as heavy of equipment as you can possibly get your hands on in this case 150lb plate compactor will typically not be enough to pound the subbase material I personally prefer to use at least 1,000lb plate Packer or 33-in trench compactor these two types of compaction equipment will typically generate a deeper lift for you giving you better compaction here's a professional tip if your subbase seems to have a high moisture content just lay down some Filter Fabric before you put your base in so once you have your

Auto-generated from the video audio.