Filling Joints and Final Compaction
At 6:59 in
How to Build a Patio - An easy Do it Yourself Project
What happens here
Once the pavers are laid, the final step is to fill the joints. Spread a layer of sand over the entire patio and sweep it into all the gaps between the pavers. Then, use a 150-pound plate compactor to vibrate the patio, settling the sand deep into the joints. Sweep more sand as needed and re-compact until the joints are completely filled to the top. Two types of sand can be used: regular sand or polymeric sand. The presenter recommends regular sand due to long-term issues with polymeric sand. Polymeric sand is a water-activated blend that binds together when wet, preventing weed growth and insect infestation. However, after 3-5 years, it can 'chunk' and break apart, requiring a complete removal and re-installation. Regular sand, while requiring annual maintenance (sweeping and hosing off a fresh bag of sand), is a simpler and more forgiving option in the long run.
Goal: Fill paver joints with sand and compact the patio for a finished, stable surface.
Tools and materials
- Broom — Sweeping sand into paver joints
- Garden Hose — Activating polymeric sand or rinsing regular sand
- Plate Compactor — Vibrating the patio to settle sand into joints
- Polymeric Sand Techniseal — Alternative for filling paver joints (water-activated)
- Regular Sand — Filling paver joints
What they say
(1,721 characters)Hide
What they say
(1,721 characters)Auto-generated from the video audio.