Creating the Sand/Screed Base

3:40
9:40
2.2M views

At 3:40 in

How to Build a Patio - An easy Do it Yourself Project

What happens here

The final base layer is a screed base of sand. It is critical to maintain exactly 1 inch of sand. To achieve this precision, place 1-inch diameter pipes (e.g., steel pipes) on the compacted Class 5 base. Spread sand between these pipes and use a straight edge (like a 2x4) to 'screed' or level the sand across the top of the pipes, creating a perfectly uniform 1-inch thick layer. The reason for the 1-inch maximum is that sand has no cohesive material, meaning it can shift under pinpoint pressure. If the sand layer is too thick, pavers can tip and become uneven over time. Once a section is screeded, carefully remove the pipes and fill the voids with sand before placing pavers.

Goal: Lay a precise 1-inch layer of sand for the pavers.

Tools and materials

  • 1-inch Diameter Pipes/Bars — Acting as screed rails to ensure a uniform 1-inch sand depth
  • Screed Board — Leveling the sand across the screed rails
  • Shovel — Spreading sand
  • Wheelbarrow True Temper — Transporting sand
  • Sand — Creating the bedding layer for pavers

What they say

Hide

day I installed it now you've got your base material in you've got it compacted the third and final element to preparing your base for a p patio paper installation is your sand or your screed base the critical measurement you need to keep in your mind is 1 in the reason you do not want to go more than 1 in with the sand is because it has no cohesive material in it which means that the sand has the potential to move and if you take a pinpoint pressure on the edge of a block that you install in a PA patio and you put enough force on the edge of that one pav it has the potential to push down which means that the other end pushes up some of my best installers have fought me on this point until I've asked them to put their name their reputation and their guarantee on the line and they tend to agree with [Music] you you can see the sub cut we've made the yellow line indicates the height of the paper Pao the class 5 Base needs to still come up and then we put a place an inch of sand very technical today we're preing prepping the base but I've said it before too much sand is a bad thing and I'm going to show you how to get your sand absolutely precise we have the class five Bas in Come a Little Closer what you're going to see is our trick to get about 1 in of sand and that is to use a 1- in pipe it's as simple as that this is the depth of the sand you need underneath your pavers no more no less you lay this pipe down you put your screed rail on top of it and that is the sand layer you can actually see a finished section right over here this is finished to exactly one in of sand more than that is going to make your pavers tip a lot of people get