Lay Patio Pavers (Main Area)
0:51
15:01
10.2K views
At 0:51 in
How to Build a new Patio 4K
What happens here
After the gravel base is compacted, workers begin laying large, light-colored paver tiles. They use string lines and levels to ensure the pavers are installed in a straight line and achieve the desired flat and even surface. The discussion from the previous step continues, highlighting the importance of proper base preparation and the 'overkill' approach of using excessive base material (2 feet of rock instead of the recommended 6 inches) to prevent movement or shifting over time, particularly for heavy structures or vehicles.
Goal: This step involves carefully laying large paver tiles on the compacted gravel base, ensuring proper alignment and a level surface.
Tools and materials
- Level
- Paver Tiles
- Rubber Mallet
What they say
(2,496 characters)Hide
What they say
(2,496 characters)Auto-generated from the video audio.