Install Walkway Pavers
8:46
15:01
10.2K views
At 8:46 in
How to Build a new Patio 4K
What happens here
Once the granite chip base is screeded and paver tiles are cut, they are laid along the narrow walkway connecting to the main patio. The tiles are placed carefully to ensure they are level and fit snugly against the edge restraints and the main patio. Workers use rubber mallets to gently tap the pavers into final position, creating a seamless and stable walking surface.
Goal: This step completes the walkway by laying the cut paver tiles onto the prepared granite chip base.
Tools and materials
- Level
- Paver Tiles
- Rubber Mallet
What they say
(70 characters)Hide
What they say
(70 characters)Auto-generated from the video audio.