Skip to main content

Install Vertical Metal Siding Panels

0:36
18:00
22.8K views

At 0:36 in

How NOT to install Metal Siding- PRO Tips & Everything you need to know from start to finish pt2 4 k

What happens here

Begin installing the vertical metal siding panels. Starting from a corner or designated edge, align the first panel with the previously installed trim. Overlap subsequent panels according to the manufacturer's specifications. Secure each panel to the building's studs using color-matched screws, typically driven through the flat sections of the panel, not the ribs, to prevent water infiltration. For upper sections and gable ends, use scaffolding or ladders for safe access.

Goal: Cover the building walls with metal siding.

Tools and materials

  • Circular Saw with Metal Blade — Cutting panels to length (can also use tin snips or angle grinder)
  • Drill/Driver Milwaukee — Driving screws to fasten panels
  • Safety Glasses — Eye protection from metal shavings and debris
  • Scaffolding/Ladders — Accessing higher sections of the walls and gable ends
  • Tape Measure — Measuring panel lengths
  • Work Gloves — Protecting hands from sharp metal edges
  • Color-matched Screws — Fastening metal panels
  • Vertical Metal Siding Panels — Covering the exterior walls