Skip to main content

Initial Plank Layout and Complex Cuts

4:25
20:02
29K views

At 4:25 in

How NOT to install Hardwood Floors- Before during & After including all our screw ups

What happens here

The installer begins to lay the first rows of engineered wood planks, interlocking them together. When encountering a curved log pillar, a paper template is created to accurately trace the pillar's contour onto a plank. An electric jigsaw is then used to cut this intricate shape. It's noted that initially, cutting from the top side caused splintering. The installer also ensures a 3/8-inch expansion gap is maintained around fixed objects, which is critical for floating floor systems to accommodate movement.

Goal: The first rows of engineered wood planks are laid, involving detailed cuts around irregular obstacles like log pillars.

Tools and materials

  • Electric Jigsaw
  • Engineered Wood Planks
  • Measuring Tape
  • Paper Template
  • Pencil/Marker
  • Small Wedges/Spacers

What they say

Hide

would smelling the floor not me one of the problems we have is tons of little cuts Frankie what's your solution to that I mean templates okay so we made a template because this is a floating hardwood floor yeah and that's how we

Auto-generated from the video audio.