Clean Subfloor & Lay Vapor Barrier Underlayment
At 3:20 in
How NOT to install Hardwood Floors- Before during & After including all our screw ups
What happens here
Following the removal of the old carpet and underlayment, the concrete subfloor is meticulously cleaned using a shop vacuum and a broom. This step is highlighted as critical for the long-term success of the new flooring. A blue vapor barrier underlayment is then unrolled and laid across the entire area where the engineered wood planks will be installed. This underlayment is essential for floating floors, as it helps to absorb minor imperfections in the subfloor, provides a crucial moisture barrier, and allows the floor to expand and contract freely.
Goal: The subfloor is thoroughly cleaned and a vapor barrier underlayment is laid to provide a smooth, moisture-resistant base for the new flooring.
Tools and materials
- Broom
- Shop Vacuum
- Underlayment (Vapor Barrier)
What they say
(692 characters)Hide
What they say
(692 characters)Auto-generated from the video audio.