The video opens with a team discussing the scope of work, which involves removing a series of large evergreen trees situated on a slope. The immediate challenge encountered is an unmarked storm sewer line discovered during initial excavation, complicating the retaining wall construction plan.

Goal: Understand the project scope and identify unforeseen challenges.

Tools and materials

  • Excavator — Initial digging and tree handling
  • Shovel — Manual excavation
  • Skid-steer Loader — Site preparation and moving materials

What they say

Hide

usually there's not enough especially with this concrete pipe I bet there's not be able to and she started getting sketchy we hit storm sewer so this wasn't marked and I thought it was a curb [Music] [Applause] let's go [Music] Alex shattered the door no oh the door I'm not making that phone [Music] [Applause] [Music] call all right guys welcome to the show my name is Stan genetic I'm the dirt monkey and every job seems to hold an adventure of some way shape or form and today is no exception to the rule we're back at the school and we have a couple close calls one of them we captur directly on camera and the other one while the cameras were off and we run into some things that we weren't expecting but without wasting any more time and let's not get ahead of the story let's turn this over to Zach out on the job site and see what uh the Advent what what today's adventure brings all right good morning everyone