Set the First Course of Blocks
At 7:25 in
How NOT to Build a retaining wall. RED FLAGS, common mistakes, bad designs pt1
What happens here
Place the first course of concrete blocks directly on the compacted gravel leveling pad. Each block should be set meticulously to the correct elevation and checked for level both side-to-side and front-to-back. The video emphasizes a slight backward lean (approximately 1/4 bubble on a level) for each course. This lean, known as 'eyelash', helps the wall resist soil pressure and appear vertical over time. For blocks with 'nurls' (small protrusions), either grind them off or use an existing block to 'grind' them down to ensure a perfectly flat surface for leveling.
Goal: Carefully place and level the initial layer of concrete blocks onto the prepared gravel base, ensuring proper alignment and setback.
Tools and materials
- Concrete Retaining Wall Blocks
- Level (2-foot)
- Rubber Mallet
- String Line
What they say
(2,413 characters)Hide
What they say
(2,413 characters)Auto-generated from the video audio.