Install Drainage Aggregate and Optional Drain Tile
At 1:46:25 in
How NOT to Build a retaining wall. RED FLAGS, common mistakes, bad designs pt1
What happens here
Fill the area immediately behind the first course of blocks with clean, crushed drainage aggregate. The video recommends 18-24 inches of aggregate depth, noting that while 12 inches is typical, more provides better drainage. If using drain tile, place it at the base of the drainage aggregate layer, ensuring it has a slight slope to direct water away from the wall. The purpose of the aggregate is to allow water to pass freely, preventing hydrostatic pressure buildup. A properly designed aggregate zone is often sufficient, making drain tile optional in many cases.
Goal: Backfill behind the wall with ample drainage aggregate and, if desired, install a drain tile to manage water effectively.
Tools and materials
- Drain Tile (Optional)
- Rake
- Shovel
- Clean Crushed Drainage Aggregate