Fill Voids and Compact Base by Hand (Small Area)
9:38
15:09
124.1K views
At 9:38 in
How NOT to build a paver patio. Why they FAIL and how to do a DIY repair on landscaping. 4 k video
What happens here
Fill the cleared voids with new Class 5 base material, then add leveling sand. Use hand compaction tools (such as a basing hammer or hand tamper) to thoroughly compact the base material. When working near retaining walls, avoid using motorized plate compactors, as their vibrations can damage the wall. For these small areas, it is sometimes acceptable to use slightly more leveling sand (up to 1.5 inches) than the standard 1 inch, to blend with existing levels, but this is an exception for very small, isolated repairs.
Goal: Create a stable and level base in small, confined areas.
Tools and materials
- Basing Hammer or Hand Tamper
- Small Trowel or Board
- Class 5 Base Material
- Paver Sand (Leveling Sand)