Skip to main content

Final Grading and Mulching

7:34
16:33
57.1K views

At 7:34 in

How NOT to build a BERM.

What happens here

Following equipment maintenance, the landscape is further refined. The host shows the areas that have been regraded, emphasizing the placement of the berms. A large dump truck delivers a pile of mulch, which is then distributed across the graded areas using the Cat skid steer. Workers follow behind the skid steer, using rakes and shovels to manually spread and even out the mulch, covering the berms and other newly graded sections of the yard. This step completes the aesthetic and protective layering of the berms.

Goal: The yard undergoes final grading, mulch is delivered by a dump truck, and then spread across the newly formed berms by both a skid steer and manual labor.

Tools and materials

  • Cat Skid Steer Loader
  • Dump Truck
  • Rakes
  • Shovels
  • Mulch

What they say

Hide

all right good morning everyone so we should have a pretty easy day out on our little hodgepodge wall berm site the wall's all finished up the grating over here everything's done with that um we got the berms where they need to be we got this whole area re-graded pretty close to where the final grade is going to be obviously we're going to get the mulch down and then work our way out with the grade we have to get a little bit of edging in around there and then haul equipment so here we go here it comes there it comes look at that steaming pile of mulch yeah you're getting pretty smooth in this you've come a long way with your uh your operating skills since you first started that's for sure man

Auto-generated from the video audio.