Excavation and Retaining Wall Construction
1:16
16:33
57.1K views
At 1:16 in
How NOT to build a BERM.
What happens here
This time-lapse sequence demonstrates the initial excavation and construction of a block retaining wall under an existing deck. Workers use shovels to dig out the soil, lay a base course for the wall, and then stack concrete retaining wall blocks to form a curved structure. A skid steer is seen moving soil and materials, highlighting the use of heavy machinery for efficient site preparation and earthmoving.
Goal: Build the foundational retaining wall structure.
Tools and materials
- Concrete Retaining Wall Blocks
- Shovels
- Skid Steer