Detailed Retaining Wall Inspection and Post Integration
11:35
16:33
57.1K views
At 11:35 in
How NOT to build a BERM.
What happens here
The presenter provides a detailed look at the finished retaining wall and how a crucial element, a treated 2x10 wooden post, was integrated to address a mismatch with existing posts and footings. He explains that brackets were installed at the back to secure the post to the foundation, and silicone sealant was used to prevent debris from falling through gaps, ensuring a sturdy and visually cohesive structure.
Goal: Review the finished retaining wall and specialized post integration.
Tools and materials
- Brackets
- Silicone Sealant
- Treated 2x10 Wooden Post
What they say