Skip to main content

Patio Base Preparation & Screeding

0:51
18:32
61.9K views

At 0:51 in

How Much MONEY Do Landscapers REALLY MAKE ?!? 4 k

What happens here

After initial excavation, a layer of recycled Class 5 aggregate (approximately 6 inches deep) is spread and compacted to form a stable base for the patio. Following this, a 1-inch layer of screened sand is spread over the compacted aggregate. A screed board is then used to level the sand and establish the precise slope for the patio, ensuring water drains effectively away from the house. This meticulous process ensures a uniform and correctly sloped surface for the pavers.

Goal: A stable base is created for the paver patio by spreading and compacting recycled aggregate, followed by a screeded layer of sand to establish the correct grade for drainage.

Tools and materials

  • Plate Compactor (Tomahawk brand shown)
  • Rakes and Shovels
  • Screed Board (2x4 or similar)
  • Skid Steer (ASV RT-75)
  • Recycled Class 5 Aggregate Unspecified
  • Screened Sand Unspecified

What they say

Hide

today we're going to be talking about how to understand your pricing and put together your proposals we want to show you what the project is first and then at the end of the video what i'm going to do is i'm going to break down ways that you guys as contractors can put together a proposal that protects you but also makes the comfortable be really makes the customer be really comfortable about what they're getting so let's just dive right into it

Auto-generated from the video audio.