Initial Site Preparation & Rough Grading

0:05
18:32
61.9K views

At 0:05 in

How Much MONEY Do Landscapers REALLY MAKE ?!? 4 k

What happens here

Use heavy machinery, specifically a track loader (ASV RT-75) and a mini excavator (Bobcat 325), to remove any existing concrete or patio blocks and perform initial excavation. The mini excavator is used for more precise digging close to the house, while the track loader handles larger volumes of dirt for rough grading and material movement. This establishes the initial contours and removes obstructions for the upcoming patio and drainage work.

Goal: The first step involves removing existing structures and performing rough excavation and grading of the work area around the house to prepare for the new patio and drainage system.

Tools and materials

  • ASV RT-75 Track Loader
  • Bobcat 325 Mini Excavator
  • Shovels