Final Grading and Backfilling for Drainage Slope
At 10:57 in
How Much MONEY Do Landscapers REALLY MAKE ?!? 4 k
What happens here
This critical step focuses on establishing a 'positive drainage slope' away from the house foundation and the new patio. Using a compact track loader (skid steer) for larger areas and hand tools like rakes and shovels for fine-tuning, the soil is carefully shaped. The goal is to ensure all surface water flows away from the structure at a minimum slope of 1/8 to 1/4 inch per foot. Excess dirt from initial excavation, or imported topsoil (like the 'black dirt' mentioned by the presenter), is used to build up low areas and create these necessary slopes. The drainage trenches are backfilled, and the entire area is meticulously smoothed and refined, often with the aid of a laser level for precision, although not explicitly shown in the video. This finished grading is essential for preventing water damage and maintaining a healthy landscape.
Goal: Perform final grading and backfilling around the patio and house foundation, creating precise slopes to effectively direct water away and improve overall yard drainage.
Tools and materials
- ASV RT-75 Compact Track Loader
- Laser Level (Rotary or Line)
- Rakes
- Receiver for Laser Level
- Shovels
- Black Dirt (Topsoil) N/A
What they say
(1,712 characters)Hide
What they say
(1,712 characters)Auto-generated from the video audio.