Initial Pool Bottom Demolition with Excavator & Boulder
At 0:28 in
Heavy Demolition in 4 k!
What happens here
An excavator, specifically a Kobelco model, begins the demolition process by using its standard digging bucket to lift, pry, and break the initial sections of the heavily reinforced concrete pool bottom. Large pieces of concrete, intermingled with exposed rebar, are pulled free. Following this initial breach, the excavator then uses its bucket to lift a massive boulder and repeatedly drops it onto the concrete floor of the pool. This percussive action creates extensive stress fractures, effectively acting as an improvised, non-hydraulic breaker, softening the concrete for further demolition.
Goal: The excavator's bucket is first used to pry and break away initial sections of the pool bottom, followed by repeatedly dropping a large boulder to create significant stress fractures in the thick, reinforced concrete.
Tools and materials
- Excavator Bucket WF
What they say
(271 characters)Hide
What they say
(271 characters)Auto-generated from the video audio.