Initial Pool Bottom Demolition with Excavator & Boulder

0:28
14:02
72.8K views

At 0:28 in

Heavy Demolition in 4 k!

What happens here

An excavator, specifically a Kobelco model, begins the demolition process by using its standard digging bucket to lift, pry, and break the initial sections of the heavily reinforced concrete pool bottom. Large pieces of concrete, intermingled with exposed rebar, are pulled free. Following this initial breach, the excavator then uses its bucket to lift a massive boulder and repeatedly drops it onto the concrete floor of the pool. This percussive action creates extensive stress fractures, effectively acting as an improvised, non-hydraulic breaker, softening the concrete for further demolition.

Goal: The excavator's bucket is first used to pry and break away initial sections of the pool bottom, followed by repeatedly dropping a large boulder to create significant stress fractures in the thick, reinforced concrete.

Tools and materials

  • Excavator Bucket WF

What they say

Hide

guy in Boulder and I know that's gonna sound bass-ackwards but by the time we finish this video you might be like I'm gonna use a giant boulder when I remove a concrete swimming pool so what are we waiting for let's dive right into this job you know we used to do all the

Auto-generated from the video audio.