Efficient Wall Demolition & Inspector Consultation
At 5:32 in
Heavy Demolition in 4 k!
What happens here
Following the saw demonstration, the excavator resumes demolishing the pool walls, proving that the boulder-based stress fractures provide sufficient weakening without the need for additional relief cuts. The operator uses the excavator to apply force directly, breaking and pulling sections of the wall. Later, a local city inspector arrives on site to assess the progress. The inspector confirms that all concrete chunks remaining in the ground must be no larger than 12 inches to prevent future settlement issues and emphasizes the necessity of complete removal rather than just backfilling over debris. This highlights the regulatory importance of thorough demolition.
Goal: The excavator effectively demolishes sections of the pool walls without the need for pre-cut relief cuts, reaffirming the efficiency of the boulder method. A city inspector then reviews the ongoing demolition to ensure compliance with local regulations regarding debris removal.
Tools and materials
- City Inspector Local Government
- Excavator Bucket WF (likely custom)
- Kobelco Excavator Kobelco
What they say
(1,121 characters)Hide
What they say
(1,121 characters)Auto-generated from the video audio.