Installing the Initial Culverts
10:31
26:41
21.3K views
At 10:31 in
Guess What We're Building! Another Massive Earth Moving Farm Project Today!
What happens here
The dozer (Caterpillar 953C Track Loader) begins the main construction phase by carefully pushing and positioning the first set of 30-inch steel gas line pipes into the prepared creek crossing. The pipes are laid out sequentially to create a channel for water flow. This process involves precise maneuvering of the heavy machinery to ensure proper alignment and stability of the culverts in the creek bed.
Goal: Place multiple 30-inch pipes to form the primary water channel.
Tools and materials
- 30-inch Steel Gas Line Pipes — Forming the base culverts
- Heavy Chains — Securing and dragging the pipes with the dozer