Final Grading and Future Plans
At 22:00 in
Guess What We're Building! Another Massive Earth Moving Farm Project Today!
What happens here
The final stage of construction involves detailed grading of the entire bridge area. The dozer meticulously levels the surface, ensuring a smooth and functional pathway for farm equipment. The presenter expresses satisfaction with the project's outcome, noting the robust construction designed to withstand significant water flow and prevent washouts. Future plans include adding a layer of gravel for a smoother driving surface and preparing the surrounding fields for new pastures, eventually cutting hay. This project, with a total cost of approximately $5,000, significantly improves farm accessibility and land management.
Goal: Complete the bridge, ensuring functionality and outlining future improvements.
Tools and materials
- Belmont Dump Trailer Belmont — Transporting gravel for the final surface layer
- Tractor with Drag Harrow — Smooth out the surface for a better finish
- Gravel — Creating a durable, all-weather driving surface