Demobilize Skid Steer from Cancelled Job Site
At 6:54 in
"Guess We're Fired?"
What happens here
With the job unexpectedly cancelled, the crew begins the demobilization process. Alex, a crew member, lowers the rear ramps of the Rice trailer. The Kubota SVL 75-2 skid steer, still equipped with its fork attachment, is then carefully driven backward up the ramps and positioned centrally on the trailer deck. Subsequently, heavy-duty chains are used to tightly secure the skid steer to the trailer's designated tie-down points, and chain binders are engaged to tension the chains, ensuring the equipment's stability during transport. After the machine is secured, the ramps are raised and latched.
Goal: Following the job cancellation, the crew loads the Kubota SVL 75-2 skid steer onto the Rice trailer and securely chains it down, preparing for departure.
Tools and materials
- Chain Binders
- Heavy-duty Chains
- Kubota SVL 75-2 Compact Track Loader
- Rice Trailer
What they say
(2,494 characters)Hide
What they say
(2,494 characters)Auto-generated from the video audio.