Skip to main content

Prepare and Add Liquid Binder

0:00
1:30
15.4K views

At 0:00 in

GTFK 2 part epoxy from SHS Distributors #pavers #hardscape

What happens here

Begin by preparing the jointing compound. Open the bucket containing the dry aggregate component of the paver joint filler, which is labeled 'Xtreme vdw 850 plus'. Carefully pour the liquid binder component from its bottle into the bucket of aggregate. Ensure all of the liquid is transferred to the aggregate.

Goal: Combine dry aggregate with liquid binder

Tools and materials

  • Chemical-Resistant Gloves — Protecting hands from the jointing compound and binder
  • Safety Glasses — Protecting eyes from splashes or dust
  • Liquid Binder Component — To bind the aggregate particles together and provide durability