Initial Rough Grading
22:49
36:02
30.8K views
At 22:49 in
Grading with a Crippled machine
What happens here
The presenter begins the initial rough grading of the dirt path using the skid steer with the 4-in-1 bucket. He lowers the bucket and drives forward, scraping away high spots and collecting loose dirt. He then spreads this dirt into lower sections and towards the edges of the path. He makes several passes, focusing on leveling the area and eliminating the large hump. He carefully navigates around existing trees and attempts to blend the graded path with the grassy areas, being cautious not to damage the surrounding grass or the neighbor's property line.
Goal: Remove major unevenness and begin shaping the dirt path
Tools and materials
- 4-in-1 Bucket — Attached to the skid steer for grading
- Bobcat S185 Skid Steer Bobcat — For scraping and moving dirt
What they say
(733 characters)Hide
What they say
(733 characters)Auto-generated from the video audio.