What happens here
The project begins with an introduction to the goal: to grade a section of a lawn that has an uneven hump and make it level. The owner and his neighbor, Donna, discuss the issue with the hump making it difficult to move a utility trailer. The area also has tree stumps and various overgrown plants that need to be addressed. The plan is to blend the existing soil to create a smooth, level grade within the defined work zone, avoiding the main lawn areas.
Goal: Understand the current state of the lawn and plan the grading approach