Site Clearing and Initial Base Layering

2:21
18:41
83.6K views

At 2:21 in

Full day of work excavating & Landscaping a backyard with new retaining walls 4k Timelapse

What happens here

Workers utilize shovels to further refine the excavated area, ensuring an even subgrade. A skid steer continues to clear the bulk of the excavated material, creating a cleaner work zone. The granular base material is then introduced into the trench. Although not explicitly shown in this segment, a vibratory plate compactor is visible nearby, indicating that this base layer will be compacted to provide a solid, level, and stable foundation for the retaining wall blocks. Proper compaction at this stage is critical for the long-term stability of the wall.

Goal: Workers continue clearing excavated material and begin laying the initial granular base layer for the retaining wall, preparing for eventual compaction.

Tools and materials

  • ASV RT-75 Posi-Track Skid Steer
  • Shovels
  • Vibratory Plate Compactor
  • Granular Base Material