Skip to main content

Installing Base Blocks and Addressing Frost Footing

2:44
18:41
83.6K views

At 2:44 in

Full day of work excavating & Landscaping a backyard with new retaining walls 4k Timelapse

What happens here

The initial course of retaining wall blocks is carefully placed on the compacted granular base. This base course is critical as it sets the alignment and stability for the entire wall. An unforeseen challenge arises with the discovery of an old concrete frost footing. This requires the workers to custom-notch the base blocks to fit snugly against the footing, ensuring a tight and secure fit against the existing foundation without compromising the wall's structural integrity. This precise work is essential for the wall to withstand soil pressure and prevent shifting over time.

Goal: The first course of retaining wall blocks is meticulously laid on the prepared base, while also addressing an unexpected pre-existing concrete frost footing that requires custom notching of the blocks.

Tools and materials

  • Leveling Tools (e.g
  • laser level
  • spirit level)
  • Retaining Wall Blocks
  • Shovels
  • Wet Saw (custom cutting tool)
  • Granular Base Material

What they say

Hide

so every job has a surprise and here's ours this is the frost footing it's about three and a half feet higher than where it's supposed to be and so to actually get our block to fit flush up tight against that wall means that bottom block we're gonna have to actually knock around that frost footing so that we can get good I don't know just a good tight fit for our wall up against the foundation

Auto-generated from the video audio.