Skip to main content

Laying Subsequent Wall Courses and Initial Backfilling

3:24
18:41
83.6K views

At 3:24 in

Full day of work excavating & Landscaping a backyard with new retaining walls 4k Timelapse

What happens here

The video highlights the division of labor within the construction crew: a 'basing crew' focuses on the critical initial courses, while a 'building crew' stacks subsequent layers of blocks. For smaller walls, the 'building crew' also handles the initial backfilling behind the laid blocks. On larger projects, separate teams handle building and backfilling simultaneously to maintain efficiency and ensure stability. As blocks are stacked, the space behind them is filled with granular material, providing essential support. This process implies careful layering and compaction (though not explicitly shown in detail for *each* layer of backfill in this segment) to prevent future settling or movement of the wall.

Goal: The construction of the retaining wall progresses with additional courses of blocks being laid, emphasizing the specialized roles within the team and the importance of continuous backfilling.

Tools and materials

  • Retaining Wall Blocks
  • Shovels
  • Granular Backfill Material

What they say

Hide

so when we're building a retaining wall we divide the construction crews into two separate categories one is the basing crew and then two is the building crew now the basing crew will usually be a one or a two man crew that crews sole job is just to lay down that bottom course which is the most critical element and probably the most time-consuming part of the entire construction process we'll have one guy that just knows how to base and the second guy will feed that person blocks now in a small retaining wall like this we may have that second person that's feeding the base or blocks also start to build the retaining wall as well but when we get on bigger projects that's when we really have two or three guys all they'll be doing is just building and backfilling retaining walls while one or two other guys are still continuing to try to base and get ahead of them when they start to work in tandem like that that's when you can start to get the most production out of a jobsite [Music] [Applause] [Music] so you're just gonna burn up the dirt on

Auto-generated from the video audio.