Assess and Position Equipment
0:00
1:01
9K views
At 0:00 in
Doing cowboy Sh*t.
What happens here
The project begins with an assessment of the task: installing a large wooden beam. The primary challenge identified is a large tree obstructing the path for positioning the beam. A Genie GTH-844 telehandler is already on site and positioned to begin the lifting operation. This initial phase involves planning the lift and ensuring the machinery is in the correct starting location.
Goal: Prepare the site and machinery for lifting the beam.
Tools and materials
- Genie GTH-844 Telehandler Genie — Lifting and maneuvering the heavy wooden beam
- Site Plan/Blueprints N/A — Planning the exact placement of the beam and identifying obstacles
What they say
(115 characters)Hide
What they say
(115 characters)Auto-generated from the video audio.