Final Inspection and Project Completion
At 5:44 in
DIY Spray Foam Insulation To Lower Energy Bill
What happens here
The host announces the completion of the entire insulation project, which took a total of two weeks of dedicated work. All sloped walls and ceilings are now fully insulated with the combination of spray foam and fiberglass batts, achieving the desired R49 value. The vapor barrier has been installed where necessary. The energy inspection passed successfully, allowing the project to proceed to the next phase: drywall installation. The host expresses satisfaction with the cost savings achieved by performing the work himself.
Goal: After two long weeks, the insulation project is completed, with all walls and ceilings fully insulated and a vapor barrier installed where needed, and the energy inspection is passed.