Install Herringbone Backsplash & Paint Walls
At 6:46 in
DIY Master Bathroom Makeover
What happens here
Prepare a mixture of thin-set mortar using a drill with a paddle mixer. Apply the thin-set to the wall above the vanity. Begin laying 2x8 inch subway tiles in a herringbone pattern. The best method is to set the base row first, ensuring each piece is at a perfect 45-degree angle using a small speed square. Continue tiling upwards, using 1/8 inch rubber spacers to maintain consistent grout lines. Once all tiles are set, apply charcoal grout to fill the spaces between the tiles. After the grout dries, paint the remaining exposed wall sections with Sherwin Williams Frosted White paint, covering any previously painted mustard yellow areas. This step creates a modern and clean aesthetic for the bathroom walls.
Goal: Apply a decorative tile backsplash and refresh wall paint
Tools and materials
- 1/8 inch Rubber Spacers — Maintaining consistent grout lines between tiles
- Cordless Drill Milwaukee Fuel — Mixing thin-set mortar and grout
- Grout Float — Spreading grout
- Paddle Mixer Attachment — Mixing thin-set mortar and grout
- Paint Brush — Cutting in edges and detail painting
- Paint Roller — Applying paint to large wall areas
- Painter's Tape — Masking off areas not to be painted or grouted
- Small Speed Square — Ensuring correct 45-degree angles for herringbone pattern
- Sponge — Cleaning excess grout
- Tile Cutter — Cutting subway tiles for pattern and edges
- 2x8 inch Subway Tiles — Creating the herringbone pattern backsplash
- Charcoal Grout — Filling the joints between backsplash tiles
- Thin-set Mortar — Adhering backsplash tiles to the wall
What they say
(692 characters)Hide
What they say
(692 characters)Auto-generated from the video audio.