Using a Daewoo excavator equipped with a grapple attachment, the crew begins removing snow and excavating soil from around the existing timber retaining wall. The ground is noted to be unfrozen despite the snow, indicating that the snow acted as an insulator. This initial excavation helps expose the old wall for demolition and prepares the area for the new wall's construction. The excavator is maneuvered carefully to manage the snowy and muddy conditions.

Goal: Clear snow and excavate soil to expose the old wall for demolition.

Tools and materials

  • Daewoo Excavator — Heavy excavation and demolition
  • Safety Cones — Marking active work zones

What they say

Hide

[Music] eight inches of snow we got eight inches of heavy heart attack snow right in october october 20th so this had to be about october 22nd [Music] thankfully the pile was tarped and with that snow blanket over it the soil ground's probably soft not frozen i'm gonna guess that snow insulated the soil because we were right at that that freeze fall state