Final Rough Grading of Backfill
15:42
27:30
26.1K views
At 15:42 in
Demolition Project with Before, During and After Timelapse
What happens here
The ASV RT-75 skid-steer continues spreading and rough grading the remaining dirt within the pool area. This prepares the site for final grading and ensures a level surface for the new lawn. The narrator emphasizes the two zones: the structural zone (bottom to 12 inches below surface) and the organic zone (top 12 inches).
Goal: Complete rough grading and define structural/organic zones
Tools and materials
- ASV RT-75 Skid-Steer Loader ASV — Rough grading and spreading dirt
- Dirt — Final backfill
What they say