Initial Site Prep & Equipment Setup
At 0:00 in
Demolition Day
What happens here
The work begins with general site preparation, using an ASV RT-75 Posi-Track skid steer with a large bucket attachment to clear significant boulders and level the surrounding dirt near the house's foundation. Following this, the crew prepares the equipment by driving to a fuel station to fill multiple SureCan diesel fuel containers, which are then used to refuel the skid steer directly on-site. Additionally, a smaller CastLoaders Carbon 33T mini loader, previously covered with a tarp, is uncovered and jump-started, indicating preparation for its role in the demolition process.
Goal: This step involves initial ground preparation around the building, including moving large rocks and leveling the dirt. Crucially, it covers the essential task of fueling and preparing the heavy machinery required for the demolition work.
Tools and materials
- ASV RT-75 Posi-Track Skid Steer
- CastLoaders Carbon 33T Mini Loader
- Diesel Fuel Cans (SureCan)
- Tarp
- Diesel Fuel
What they say
(88 characters)Hide
What they say
(88 characters)Auto-generated from the video audio.