Terminate Conductors in New Meter Box
0:34
1:08
39.1K views
At 0:34 in
Customer had a Bad Meter Socket.. And this is how you get it repaired! Thoughts? #electrician
What happens here
After installation, the new meter box is shown with the internal wiring completed. This includes terminating two hot wires and one neutral wire. These are specifically identified as 4/0 aluminum conductors, which are appropriately rated for a 200 amp service. The physical conduit for the service entrance is a 2-inch rigid pipe, providing durable protection for the conductors.
Goal: Securely connect the service conductors within the new meter box.
Tools and materials
- 2-inch Rigid Pipe — Protecting the service entrance conductors
- Electrical Lugs/Connectors — Connecting the conductors within the meter box
- New Meter Box — Housing the electrical meter and connections
- Torque Wrench — Ensuring electrical connections are tightened to specification
- 4/0 Aluminum Conductors — Main hot and neutral service wires